An Investigation on Time and Cost Overrun in Construction Projects
2012
152 pages
12 views
1 downloads
Abstract (EN)
ABSTRACT: The success of construction projects is highly dependent on meeting the aim of project and objectives within the specified time and budget. Management plays a big role in construction projects. Most important problems that management faces in the projects are methods of execution, management of workers, equipment, scheduling and money. Delay and cost overrun are two of the important defects in construction industry. These failures can lead to various types of negative affections like disputes between contractor and client, decrease quality of work and health and safety accidents. Therefore, there is a high necessity for further investigation on delay and cost overrun factors as well as quality and health & safety and suggesting right actions to minimize these kinds of defects. Keywords: Delay, Time overrun, Cost overrun, Investigation …………………………………………………………………………………………………………………………
ÖZ: İnşaat sektöründe projelerin başarısı, projenin belirtilen süre ve bütce dahilindeki hedeflerine ulaşmasına bağlıdır. Yönetim, inşaat projelerinde büyük bir rol oynar. Proje yönetiminde karşılaşılan en önemli faktörler yürütme işleri, işçilerin yönetimi, ekipman, planlama ve paradır. Gecikme ve maliyet taşması, inşaat sektöründe yer alan önemli kusurlarından ikisidir. Bu başarısızlıklar, çeşitli tiplerde olumsuz etkilere yol açabilir. Örneğin, müteahhit ve müşteri arasındaki anlaşmazlıklar, iş kalitesinin azalması ve iş sağlığı ve güvenliği kazalarıdır. Bu nedenle, gecikme, maliyet taşması, ve ayrıca kalite, iş sağlığı ve güvenliği ile ilgili daha fazla araştırmaya gerek vardır.İnşaat Anahtar Kelimeler: Gecikme, Zaman taşması, Maliyet taşması, Araştırma.
Institution
How to Cite
Changiz Ahbab (Master Thesis). An Investigation on Time and Cost Overrun in Construction Projects, 2012, pp. 1-152, Eastern Mediterranean University, DOI: https://doi.org/10.71008/emu.thesis.2012.102.
Figures & Images (9)






Keywords
DOI & Cite
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Eastern Mediterranean University
- Predicting performance level of reinforced concrete structures subject to corrosion as a function of time(2012)
- Radial Power-Law Position-dependent Mass, Cylindrical Coordinates, Spectral Signatures(2015)
- The Use of Passive Cooling Strategies to Improve the Thermal Comfort of Mid-rise Contemporary Residential Buildings in Abuja, Nigeria(2023)
- Approaching a Successful Interior Design Atmosphere for Retail Clothing Stores Case of Dereboyu Street, Lefkoşa(2017)
- Investigating and Categorizing the Concept of Flexibility in Mobile Interior Spaces: The Case Study of Yacht Interior Spaces(2015)
- Community Based Tourism (CBT) Planning- A Mechanism for Socio-Ecology Survival: A Case Study of Lake Urmia IRAN(2018)

