Kapasitelendirilmiş öbek büyüklügü modelinin petrol endüstrisi üzerine uygulaması
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In this thesis, we study capacitated lot-sizing problem with specialfeature, applicable to the petroleum refinery sector. In our model, theend-products should be stored in item-specific and capacitated storagetanks during pre-determined lead-time. Our aim is to find the optimumproduction schedule resulting minimum total cost whilst satisfyingcustomer demand. To solve this problem in a reasonable amount of time,we propose a branch-and-cut algorithm. We perform experiments basedon the data gathered from Turkish Petroleum Refineries Corporation. Inorder to evaluate our algorithm, we compare the results of our algorithmand the solution results of the optimization software.Keywords: Lot-sizing, branch-and-cut, mixed-integer-programming,petroleum sector, refineryiii
Author
Nuri Barış Nurlu
Institution
How to Cite
Nuri Barış Nurlu (Master Thesis). Kapasitelendirilmiş öbek büyüklügü modelinin petrol endüstrisi üzerine uygulaması, 2006, İhsan Doğramacı Bilkent University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from İhsan Doğramacı Bilkent University
- Osmanlı Devletinde vergi ve vergi etrafında oluşan ilişkiler üzerine bir çalışma (16.-17. yüzyıllar)(2019)
- Rastsal kümeler ve choquet-tip temsiller(2021)
- Petrol fiyatları ve getiri eğrisi(2024)
- Yalnız yaşamak: Yollar, deneyimler ve gelecek beklentileri(2025)
- Detente dönemine doğru: Johnson Mektubunun ardından Türk dış politikası(2021)
- Geç Antik Çağ'da Aşağı Tuna: Histria örneği(2023)
