An approach based on interval type-2 fuzzy sets for prioritizing emergency assembly points: The case of Muş province
2021
0 views
0 downloads
Advisor: Doç. Dr. Erkan Çelik
Abstract (EN)
More than 400 high-impact natural disasters affect the global population each year. There have been many disasters in our country throughout its history. Earthquake is the most common and most damaging type of disaster in our country. Within the scope of this thesis, especially in the first 72 hours after the earthquake, which is called the golden times, the priority of the emergency assembly areas and the prioritization of the emergency assembly points, which should be planned within the scope of the disaster management system, were examined in order for the citizens who were not yet affected by the disaster or were affected with less damage to continue their shelter and vital activities. . First, 5 main criteria and 13 sub-criteria were determined within the scope of emergency assembly points site selection criteria. The main criteria were determined as the preferability of the land, electrical infrastructure, plumbing system, safety and security and proximity. The weights of the criteria for location selection of emergency assembly points were calculated with 20 different decision makers who are experts in their fields. At this stage, the weights of each main criterion and sub-criteria were calculated using the Best-Worst approach in the literature. According to these results, the preferability of the land was determined as the most important main criterion, while landslides, flooding, etc. was determined as an important sub-criterion. In the next stage, 16 emergency assembly points for Muş province were prioritized using the interval type-2 fuzzy sets based TOPSIS approach according to the determined criteria. According to the results obtained, ATN-2 (Victory 1-2 (Nation's Garden and Park)) and ATN-12 (15 July Park) were determined as the emergency assembly points with the two highest proximity coefficients. The consistency of the results was evaluated with the results of the classical TOPSIS and MARCOS approaches. Since interval type-2 fuzzy sets are used in the proposed approach, uncertainty is taken into account more accurately and more accurate results are produced.
Author
Dr. Taner Yiğit
How to Cite
Taner Yiğit (Master Thesis). An approach based on interval type-2 fuzzy sets for prioritizing emergency assembly points: The case of Muş province, 2021, Munzur University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Munzur University
- Contact problem analysis in functionally graded layers with machine learning method(2023)
- Production of composites by reinforcing basalt fibers to polymers obtained from battery recycling-investigation of mechanical, thermal and morphological properties of composites(2023)
- Investigation on the effect of positive psychological capital on job satisfaction in working life(2023)
- Mechanical properties of pozzolan and waste tire aggregate contained steel fiber reinforced concrete(2023)
- Teacher education and qualifications of teachers in Atatürk Period(2023)
- Assessment of the heavy metal pollution in water and Viviparus contectus (Millet, 1813) samples from Demirköprü Dam Lake (Manisa)(2023)
