Analysis of pumice brick light building material production with fuzzy statistical process control technique
2019
0 views
0 downloads
Advisor: Prof. Dr. Metin Uçurum ; Dr. Öğr. Üyesi Akın Özdemir
Abstract (EN)
Statistical Process Control (SPC) is the most important a math-based tool used by engineers to control non-standard production and to ensure that production outputs are performed at specified quality ranges. However, in cases where conventional SPC is inadequate, fuzzy statistical process control approaches have been developed which enable more precise statistical process control using fuzzy set theory. In this study, fuzzy statistical process control techniques have been used to determine whether Bims, a lightweight construction material with fuzzy observation values, is under control of the production process.
Author
Dr. Kader Kaplan Göztok
How to Cite
Kader Kaplan Göztok (Master Thesis). Analysis of pumice brick light building material production with fuzzy statistical process control technique, 2019, Bayburt University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Bayburt University
- Critical edition of Sherhu'l-Emsileti'l-Mukhtalifa for Muhammed b. Hamid el-Kefevi(2018)
- Effect of fineness on lime stabilization of low plasticity clays(2019)
- Investigation of fluidizing chemical additive compatibility of composite cements produced with yellow and grenn tuffs of Bayburt province(2020)
- Effects of biostimulant applications on strawberry development, production and quality(2022)
- Analysis of Surah Mü'min in the context of themed tafsir according to main tafsir sources(2022)
- The effect of online games on verbal communication skills: Secondary school sample(2022)
