DoktoraAçık Erişim

Risk-informed construction progress forecasting with spatio-temporal machine learning model

2024
0 görüntülenme
0 i̇ndirme
Danışman: Prof. Dr. Vedat Toğan ; Doç. Dr. Onur Behzat Tokdemir

Özet (EN)

This study represents the first application of spatio-temporal machine learning (ML) models for construction progress prediction, addressing gaps where network-based methods used in planning cannot be reflected in ML models. Existing temporal ML models struggle with short-sequence, high-frequency construction activities. To overcome these challenges, 40 spatio-temporal models were evaluated, and among them, 14 GatedGNN-based models were identified as the most accurate and robust. The study utilized a dataset comprising over 2 million records obtained from 175 weeks of construction progress reports. The GatedGNN, GatedGNN-RNN, and GatedGNN-GRU models outperformed others, achieving accuracies between 80% and 95% in cost and schedule performance indicators. Data quality issues were modeled like data poisoning, label flipping, feature manipulation, and FGSM attacks. The GatedGNN models-maintained accuracy above 80% under these attacks; however, in small datasets, FGSM attacks reduced accuracy. The prominent models can assist project managers in better predicting outcomes and making strategic decisions.

Yazar

Dr. Fatemeh Mostofı

Bu Yayına Nasıl Atıf Yapılır

Fatemeh Mostofı (Doctorate thesis). Risk-informed construction progress forecasting with spatio-temporal machine learning model, 2024, Karadeniz Technical University.

Anahtar Kelimeler

Lisans

Tüm Hakları Saklıdır

Bu eser belirtilen lisans koşulları altında paylaşılmaktadır.

Karadeniz Technical University tezlerinden daha fazlası