Tek makineda iki ölçütlü çizelgeleme problemi için yeni çözüm metodları: Ortalama akış süresi ve toplam geç kalmış iş sayısını enküçükleme
2006
0 views
0 downloads
Advisor: Prof. Dr. İhsan Sabuncuoğlu
Abstract (EN)
In this thesis, we consider the bicriteria scheduling problem of minimizing numberof tardy jobs and average flowtime on a single machine. This problem, which isknown to be NP-hard, is important in practice as the former criterion conveys thecustomer?s position and the latter reflects the manufacturer?s perspective in thesupply chain. We propose two new heuristics to solve this multiobjectivescheduling problem. These two heuristics are constructive algorithms which arebased on beam search methodology. We compare these proposed algorithms withthree existing heuristics in the literature and two new meta-heuristics. Ourcomputational experiments illustrate that proposed heuristics find efficientschedules optimally in most of the cases and perform better than the otherheuristics.Keywords: Bicriteria Scheduling, Average Flowtime, Number of Tardy Jobs, BeamSearch.
Author
Dr. Fatih Safa Erenay
How to Cite
Fatih Safa Erenay (Master Thesis). Tek makineda iki ölçütlü çizelgeleme problemi için yeni çözüm metodları: Ortalama akış süresi ve toplam geç kalmış iş sayısını enküçükleme, 2006, Bilkent University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Bilkent University
- Geç Antik Çağ'da Aşağı Tuna: Histria örneği(2023)
- Petrol fiyatları ve getiri eğrisi(2024)
- Sözle yönlendirme üzerine makaleler(2014)
- İletişim ağları ve sağlık uygulamaları için çok kollu haydut algoritmaları(2022)
- Türk Anayasa Mahkemesinin içtihatları ışığında karşılaştırmalı anayasal mutluluk(2023)
- Doğrusal karbon zincirlerinin yoğunluk fonksiyoneli teorisi ile incelenmesi(2023)