Master'sOpen Access

Tek makinede toplam gecikmeyi en azlama problemi :3-sıralaması ve ayrıştırmaya dayanan kesin çözümlü ve sezgisel algoritmalar

1994
0 views
0 downloads
Advisor: Doç. Dr. Barbaros Tansel

Abstract (EN)

ABSTRACT SINGLE MACHINE TOTAL TARDINESS PROBLEM: EXACT AND HEURISTIC ALGORITHMS BASED ON /3-SEQUENCE AND DECOMPOSITION THEOREMS Bahar Kara M.S. in Industrial Engineering Supervisor: Assoc. Prof. Barbaros Ç. Tansel September, 1994 The primary concern of this thesis is to analyze single machine total tardi ness problem and to develop both an exact algorithm and a heuristic algorithm. The analysis of the literature reveals that exact algorithms are limited to 100 jobs. We enlarge this limit considerably by basing our algorithms on the /?- Sequence and decomposition theorems from the recent literature. With our algorithm, we exactly solve 200 job problems in low CPU time, and we also solved 120 out of 160 test problems with 500 jobs. In addition we develop a heuristic based on our exact algorithm which results in optimum solutions in 30% of test problems and stays with 9% of the optimal in all test runs. Key words: Single Machine Scheduling, Minimizing Total Tardiness, Exact Algorithms, Heuristics m

Author

Dr. Bahar Kara

How to Cite

Bahar Kara (Master Thesis). Tek makinede toplam gecikmeyi en azlama problemi :3-sıralaması ve ayrıştırmaya dayanan kesin çözümlü ve sezgisel algoritmalar, 1994, Bilkent University.

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Bilkent University