Transmission Network Expansion Planning Considering Wind Farms
2019
0 görüntülenme
0 i̇ndirme
Danışman: Reza Sirjani
Özet (EN)
Recently, electrical energy consumption has been increasing significantly as a consequence of industry advancement and lifestyle quality improvement. To fulfill future energy demand, the generation capacity has to be expanded. Previously, power generation was essentially based on conventional units. But, because of some issues related to the environment and economy, the permeation of renewable energy (RE) resources in the electrical power system have been notably increased bringing significant challenges to transmission expansion planning (TEP) issue due to intermittent and unmanageable nature of the renewable resources. TEP is a mixed integer non-linear optimization problem. Where its essential aim is to determine the optimum lines to be constructed in order to transmit the power and supply the current and the predicted load in a reliable and economical way over the planning horizon. This thesis proposes a methodology for solving the TEP problem with consideration of wind farms integration into the power system. Where a hybrid heuristic optimization approach (a mixture of backward and forward approach) is utilized to find the optimum branches to be built for several scenarios of wind energy generation to show the impact of the RE resources on the TEP. Moreover, both conditions normal and N-1 contingency are considered to ensure the robustness of the system against the contingencies and check if it is able to withstand at least one contingency criterion. iv The proposed approach was applied to the 24-Bus IEEE Reliability Test System where the optimal solutions of the different cases were obtained and the results confirmed that penetration of wind farm does modify the optimal plan. Keywords: Transmission expansion planning, renewable energy resources, wind farms, forecasted load, uncertainty, IEEE-RTS, contingency N-1, optimization techniques, hybrid approach
Yazar
Dr. Alaa Babiker Hamid Ibrahim
Kurum
Bu Yayına Nasıl Atıf Yapılır
Alaa Babiker Hamid Ibrahim (Master Thesis). Transmission Network Expansion Planning Considering Wind Farms, 2019, Eastern Mediterranean University, Department of Electrical and Electronic Engineering.
Anahtar Kelimeler
Lisans
Tüm Hakları Saklıdır
Bu eser belirtilen lisans koşulları altında paylaşılmaktadır.
Eastern Mediterranean University tezlerinden daha fazlası
- An Investigation on Time and Cost Overrun in Construction Projects(2012)
- Radial Power-Law Position-dependent Mass, Cylindrical Coordinates, Spectral Signatures(2015)
- Predicting performance level of reinforced concrete structures subject to corrosion as a function of time(2012)
- Discussion of Conservation Approaches for the Selected Heritage Buildings in the Walled City of Famagusta(2019)
- High School Students' Learning Styles in North Cyprus(2011)
- Afyonkarahisar İl Merkezinde Yaşayan 18 Yaş ve Üzeri Kadınların Diyet Posasıyla İlgili Bilgi Düzeylerinin ve Posa Alım Miktarlarının Belirlenmesi(2018)
