Comperative analysis of six sigma project applications in term of firms gains

2010
0 views
0 downloads
Advisor: Prof. Dr. Muammer Nalbant

Abstract (EN)

Firms, in their intense competitive conditions, they can survive and progress in order to process, reducing costs and raising quality, re-configure. In these context, firms, applications are oriented toward more perfect. Six sigma; 3,4 defect per million and perfect orientation with an understanding of the firms to obtain successful results due today is the most effective approaches.This study; Manufacturing industry operating 11 firms, six sigma Project implementation through surveys and analysis of these applications include analysis. Pursuant to this analysis, six sigma project management practices before and after making a comparison between the economic and technical achievements have been identified as a business. Findings obtained in the ANOVA and correlation analysis were applied Minitab program.As a result of this study, the most effective strategic aims, customer satisfaction and revenue are to obtain upper management support is indispensable, cost reduction, quality and efficiency is increased, land-generation owner of human resources was concluded that increased. In addition, the factors that hampered implementation of six sigma, conscious selection of projects and findings /data that have been identified a deficiency. The average time of successful Six sigma projects to be between 6 months and 12 months and the resulting economic benefits, poject costs more than it was concluded that it was provided and profits. Most effective statistical tools pareto diagram, cause-effect diagrams and the ANOVA was determined. Six sigma practices as five years ago today that a very large and rapidly increasing, this increase in business R&D conducted with the coordination and six sigma has been identified. Time to completion of projects implemented in firms, project status and the return of the balance sheet can be measured in the six sigma improvement efforts, whether individual units have been evaluated together. In this context, the cost of project is met, profit and balance sheets of these results can be measured in this project to be completed in the prescribed period was conluded to be associated with strictly.

Author

Mehmet Altuğ

How to Cite

Mehmet Altuğ (Doctorate thesis). Comperative analysis of six sigma project applications in term of firms gains, 2010, Gazi University.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Gazi University