Developing a decision support system for cost-time trade off in project management
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
Project managers are generally requested to finish their project in a scheduled time while reducing the total cost. They can reduce the project duration by assigning more resources to the project activities. Thus, the project managers generally face a trade-off between cost and time. Some of the project activities are sometimes subcontracted to suppliers. In such cases project managers need to evaluate project activity times and their risks, project completion time, project total cost and quality of their supplier support. In this study, a multi-criteria decision support system is proposed where activity normal and crash times are evaluated along with the supplier ranking with respect to some of their attributes.
Author
Fıras Takleef
How to Cite
Fıras Takleef (Master Thesis). Developing a decision support system for cost-time trade off in project management, 2017, Gaziantep University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Gaziantep University
- Conceptual design methodology for foldable shelters(2019)
- Pilton (pastinaca armena) katkılı beyaz peynirin duyusal ve kimyasal özelliklerinin incelenmesi(2019)
- Analysis of tooth stiffness of spur gears by finite element method(2017)
- Constructions of popular culture within viral advertising: Reception analysis of Eti Benim'O virals(2021)
- Optimum usage of mixed damping systems (rubber concerete or x diagonal dampers) on multystory building(2021)
- Transcription and evaluation of Idrak newspaper(2021)