Esnek robotik hücrelerde çoklu parça tipi çizelgelemesi
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
This thesis considers the scheduling problem arising in two-machine manufacturing cells which repeatedly produce a set of multiple part-types, and where transportation of the parts between the machines is performed by a robot. the cycle time of the cell depends on the robot move sequence as well as the processing times of the parts on the machines. for highly flexible cnc machines, the processing times can be adjusted. as a result, this study tries to find the robot move sequence as well the processing times of the parts on each machine that minimize the cycle time. the problem of determining the best cycle in a 2-machine cell is first modeled as a travelling salesman problem. then an efficient 2-stage heuristic algorithm is constructed and compared with the most common heuristic approach of longest processing time.
Author
Gül Didem Batur
Institution
How to Cite
Gül Didem Batur (Master Thesis). Esnek robotik hücrelerde çoklu parça tipi çizelgelemesi, 2009, İhsan Doğramacı Bilkent University, Endüstri Mühendisliği Bölümü.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from İhsan Doğramacı Bilkent University
- Osmanlı Devletinde vergi ve vergi etrafında oluşan ilişkiler üzerine bir çalışma (16.-17. yüzyıllar)(2019)
- Rastsal kümeler ve choquet-tip temsiller(2021)
- Petrol fiyatları ve getiri eğrisi(2024)
- Yalnız yaşamak: Yollar, deneyimler ve gelecek beklentileri(2025)
- Detente dönemine doğru: Johnson Mektubunun ardından Türk dış politikası(2021)
- Geç Antik Çağ'da Aşağı Tuna: Histria örneği(2023)
