İç mekan tasarım hizmetlerinde proje yönetimi
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In this study, the concept of project management is analyzed within the framework of interior design services. Project management has been defined as the managing and coordination of all human and physical resources, in order to accomplish the predetermined goals (aim of the project, time, cost, quality), during the process of the project. Initially, the application of project management to interior design services has been discussed, defining the structure and service areas of the work and service units within the profession. Moreover, the processing of the phases of the interior design services within the project life cycle is analyzed upon the interior design profession. Thus, using modern project management techniques and procedures; the planning, execution, monitoring and control of different components of a project, such as time, communications, human resources, materials, cost has been discussed within the project life cycle. Furthermore, a research is conducted about the utilization of project management notions by the interior design firms in Turkey. The main objective of the research was analyzing the verification of use of project management notions for the interior design business upon the sample firms. The findings through the research are analyzed and further studies are proposed. Keywords: Project Management, Interior Design Services
Author
Alp Şahinoğlu
How to Cite
Alp Şahinoğlu (Master Thesis). İç mekan tasarım hizmetlerinde proje yönetimi, 1997, İhsan Doğramacı Bilkent University.
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from İhsan Doğramacı Bilkent University
- Osmanlı Devletinde vergi ve vergi etrafında oluşan ilişkiler üzerine bir çalışma (16.-17. yüzyıllar)(2019)
- Rastsal kümeler ve choquet-tip temsiller(2021)
- Petrol fiyatları ve getiri eğrisi(2024)
- Yalnız yaşamak: Yollar, deneyimler ve gelecek beklentileri(2025)
- Detente dönemine doğru: Johnson Mektubunun ardından Türk dış politikası(2021)
- Geç Antik Çağ'da Aşağı Tuna: Histria örneği(2023)
