Integrated Investment Appraisal of Waste Water Facility Project: The Case of a Proposed Waste Water Treatment Plant in South Africa
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
This analysis is an evaluation study of a Water Conservation and Resource Plan with Infrastructure Execution located in South Africa. The Cost-Benefit Analysis (CBA) in this appraisal study contains a comprehensive analysis of the Wastewater treatment plant project from various perspectives that mainly involves the project's financial, economic, stakeholder and risk analyses. The influences of each main stakeholders are measured to assess the project's potential costs and benefits. The recycling project benefits will be assessed against the option of purchasing water for use by the mining company and its large resident community of workers and their families. Keywords: Water, Wastewater, South Africa, Water treatment, Infrastructure, Cost Benefit Analysis, Integrated Investment Appraisal.
Author
Nariman Eskandar
How to Cite
Nariman Eskandar (Master Thesis). Integrated Investment Appraisal of Waste Water Facility Project: The Case of a Proposed Waste Water Treatment Plant in South Africa, 2021, Eastern Mediterranean University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Eastern Mediterranean University
- Deep Learning for Robotics(2020)
- An Investigation on Time and Cost Overrun in Construction Projects(2012)
- Radial Power-Law Position-dependent Mass, Cylindrical Coordinates, Spectral Signatures(2015)
- Predicting performance level of reinforced concrete structures subject to corrosion as a function of time(2012)
- Approaching a Successful Interior Design Atmosphere for Retail Clothing Stores Case of Dereboyu Street, Lefkoşa(2017)
- Frankenstein or The Modern Prometheus And The Psychology of Mary Shelley(2013)
