Integrated Investment Appraisal of Waste Water Facility Project: The Case of a Proposed Waste Water Treatment Plant in South Africa
2021
0 views
0 downloads
Advisor: Glenn Paul Jenkins
Abstract (EN)
This analysis is an evaluation study of a Water Conservation and Resource Plan with Infrastructure Execution located in South Africa. The Cost-Benefit Analysis (CBA) in this appraisal study contains a comprehensive analysis of the Wastewater treatment plant project from various perspectives that mainly involves the project's financial, economic, stakeholder and risk analyses. The influences of each main stakeholders are measured to assess the project's potential costs and benefits. The recycling project benefits will be assessed against the option of purchasing water for use by the mining company and its large resident community of workers and their families. Keywords: Water, Wastewater, South Africa, Water treatment, Infrastructure, Cost Benefit Analysis, Integrated Investment Appraisal.
Author
Dr. Nariman Eskandar
How to Cite
Nariman Eskandar (Master Thesis). Integrated Investment Appraisal of Waste Water Facility Project: The Case of a Proposed Waste Water Treatment Plant in South Africa, 2021, Eastern Mediterranean University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Eastern Mediterranean University
- An Investigation on Time and Cost Overrun in Construction Projects(2012)
- Radial Power-Law Position-dependent Mass, Cylindrical Coordinates, Spectral Signatures(2015)
- Predicting performance level of reinforced concrete structures subject to corrosion as a function of time(2012)
- Discussion of Conservation Approaches for the Selected Heritage Buildings in the Walled City of Famagusta(2019)
- High School Students' Learning Styles in North Cyprus(2011)
- Afyonkarahisar İl Merkezinde Yaşayan 18 Yaş ve Üzeri Kadınların Diyet Posasıyla İlgili Bilgi Düzeylerinin ve Posa Alım Miktarlarının Belirlenmesi(2018)
