An Investigation on Time and Cost Overrun in Construction Projects
2012
0 views
0 downloads
Abstract (EN)
ABSTRACT: The success of construction projects is highly dependent on meeting the aim of project and objectives within the specified time and budget. Management plays a big role in construction projects. Most important problems that management faces in the projects are methods of execution, management of workers, equipment, scheduling and money. Delay and cost overrun are two of the important defects in construction industry. These failures can lead to various types of negative affections like disputes between contractor and client, decrease quality of work and health and safety accidents. Therefore, there is a high necessity for further investigation on delay and cost overrun factors as well as quality and health & safety and suggesting right actions to minimize these kinds of defects. Keywords: Delay, Time overrun, Cost overrun, Investigation …………………………………………………………………………………………………………………………
Author
Dr. Changiz Ahbab
How to Cite
Changiz Ahbab (Master Thesis). An Investigation on Time and Cost Overrun in Construction Projects, 2012, Eastern Mediterranean University, Department of Civil Engineering.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Eastern Mediterranean University
- An Investigation on Time and Cost Overrun in Construction Projects(2012)
- Radial Power-Law Position-dependent Mass, Cylindrical Coordinates, Spectral Signatures(2015)
- Predicting performance level of reinforced concrete structures subject to corrosion as a function of time(2012)
- Some Results on Laguerre Type and Mittag-Leffler Type Functions(2017)
- Discussion of Conservation Approaches for the Selected Heritage Buildings in the Walled City of Famagusta(2019)
- High School Students' Learning Styles in North Cyprus(2011)