Detection of profiles of construction project management companies that have operations in Turkey
2015
0 views
0 downloads
Advisor: Doç. Dr. Esin Ergen Pehlevan
Abstract (EN)
Thanks to large-scale government projects, the fundamentals of construction project management understanding began to take form in the late 19th century in the USA. With the discovery of "Gantt Chart", there have been huge progresses about project schedules. The 1950s marked the beginning of the modern project management era. Two mathematical project-scheduling models were developed: CPM and PERT. In Turkey, applications and practices that consist CPM and PERT models began after 1960s and 1970s. In this thesis, the properties of construction project management companies that have operations in Turkey and the services that these companies give are determined. The construction project management perceptions of construction project management companies' representatives are examined and a field research (Survey) on the construction industry is done. The companies that take place in the thesis are chosen from the construction project management companies that provided construction project management services in medium-scaled or large-scaled construction projects (Construction area of projects are 3 million square-meters or more) or involved in at least one or more international construction projects or have at least 50 full-time employees. The number of these selected companies which have operations in Turkey were 25. 18 of them accepted to participate in the thesis. They are reached through e-mails or phone. The survey took place between March 2014 and August 2014. 9 of these companies accepted to participate in the survey by e-mail and face-to-face meetings are done with the other 9 companies. The representatives of the companies were achitects or civil engineers. The questions of the survey that this research consists, are prepared with deep literature scan. After that, questions are presented to a construction project management company representative. With his help, questions are updated. Then two meetings were organized with other construction project management representatives and clarity of questions are tested. At last, the construction project management company representative who reviewed the questions at the beginning, examined the questions again and the final state of questions are formed. Generally, the survey investigates the services of construction project management companies that have operations in Turkey, the differences between the understanding of Turkish construction project management sector and the global construction project management sector, main criterion of selection of Turkish or foreign construction project management companies and the reasons of participation of construction project management companies in construction projects. The survey consists of multiple-choice questions, questions that are answered with rating method and open-ended questions. Multiple-choice questions and Likert scale-based questions that are answered with rating method are provided to analyze the answers normatively. Open-ended questions are provided to get the opinions and detections of the sector professionals. With the help of open-ended questions, it is aimed to illustrate the construction industry and its objectives. There are 22 questions in the survey and the general topics of the questions are general information of the construction project management companies, the services that the construction project management companies perform, the perception of the local and foreign construction project management companies and the situation of the Turkish construction industry. Within this concept, in the first section of the thesis, introduction is presented. After that, the purpose, the scope and the organization of the thesis and the methods that are used in the thesis are given. General topics and the criterion of the selection of companies are explained. In section two, previous international and national researchs that are related to construction project management are given. In addition, the differences between those researchs and this thesis are presented. The difference between international researchs and this thesis are presented pretty clear. In the international researchs section, some of the research were about the construction project management fields of different countries and regions and some of the researchs were about specific topics in the construction project management field such as concurrent engineering or quality management. The main difference between the national researchs and this thesis is actuality. All of the researchs that are presented in national research section are out of date. In third section of the thesis, the concept and history of contruction project management are given. Project, construction project and construction project management terms are defined. Project management (General), cost management, time management, quality management, contract administration and safety management are described. Moreover, the term "standard" and construction project management standards are described. The definitions of the standards are made and the contents of these standards (Integration management, scope management, time management, cost management, quality management, human resources management, communication management, risk management, procurement management and project stakeholder management) are indicated according to PMBOK. In section four, the field research on the detection of profiles of construction project management companies that have operations in Turkey is presented. The objective, the concept and the methods of the research are given. The answers that the companies gave are introduced. In addition, criticism of the survey is made. In section five results and recommendations are given. The most important result of this thesis is that Turkey is new at construction project management and construction project management culture is not recognised properly. The results show that, companies that participated in the survey present the main functions of constrution project management such as project management (General), cost management, time management and quality management, but their customers (Investors) reorganise the services as they want and intervene in the concepts of the services. Other important result is the absence of construction project management standards in Turkey. As the results show, construction project management companies that have operations in Turkey have difficulties in performing the services that they offer without the construction project management standards. Another important result about the Turkish construction project management industry is the absence of arrangement and organizations about the construction project management. The perception of local investors and the negative effects of it is also considered in the results of this research. Numbers of lectures about construction project management in graduate and undergraduate programmes in Turkey are also reached as one of the main problems of underdevelopment of Turkish construction project management. The aim of this thesis is to inform the students, academists, construction project management companies and investors who get services from construction project management companies, about the situation of Turkey's construction project management sector. By this means, Turkish construction project management sector will develop and get more and more productive. This thesis will help both the new companies and the existing companies in the construction project management sector in Turkey. Existing companies can learn the insufficiencies of the sector and can have awareness about their situation. New companies can find their way by tracking the negative and the positive sides of the sector. On the other hand, with this thesis, the absence of up-to-date academic study is overcome. In this research, the field research is conducted only in construction project managent companies' perspective. Future work can be done in investors' perspective.
Author
Ahmet İslamoğlu
How to Cite
Ahmet İslamoğlu (Master Thesis). Detection of profiles of construction project management companies that have operations in Turkey, 2015, İstanbul Technical University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from İstanbul Technical University
- Removal and recovery of platinum group metals through anode slimes of moebius electrolysis(2015)
- Investigation Of Stretching Effect With Mixed Finite Element Formulations For Laminated Beams And Plates(2023)
- Fire safety measures in subways(2015)
- Gold and silver recovery from primary and secondary sources with different processes(2015)
- Fun palace as a laboratory of action/fun: Extensions and reflections of spatial experience(2015)
- İnce cidarlı kompozit kiriş olarak modellenmiş uyarlanabilir uçak kanatlarının dinamik analizi(2015)
