Çok makinalı atelyelerde kafile aktarımı
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In this thesis, a number of lot streaming problems in flow, open and job shops are investigated. Lot streaming is the process of splitting a job to al low for overlapping of its operations on various machines resulting in shorter completion times. When there is a single job, the problem is to find the size of the transfer batches ("subiots") which minimizes a given performance mea sure (e.g., makespan, mean flow time). Multi-job problems are harder, since sequencing and sizing decisions must be made simultaneously. Most of the cur rent research in lot streaming is concerned with minimum makespan problems in flow shops. In this study, other performance measures and shop structures are also analyzed. Optimal sublot sizes are derived for the single job two ma chine flow shop mean flow time problem. Solution methods are proposed for the minimum makespan problem in open shops both for multiple job and single job cases. Key words: Scheduling, Lot Streaming, Flow Shops, Open Shops, Job Shops m
Author
Alper Şen
Institution
How to Cite
Alper Şen (Master Thesis). Çok makinalı atelyelerde kafile aktarımı, 1994, İhsan Doğramacı Bilkent University.
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from İhsan Doğramacı Bilkent University
- Osmanlı Devletinde vergi ve vergi etrafında oluşan ilişkiler üzerine bir çalışma (16.-17. yüzyıllar)(2019)
- Rastsal kümeler ve choquet-tip temsiller(2021)
- Petrol fiyatları ve getiri eğrisi(2024)
- Yalnız yaşamak: Yollar, deneyimler ve gelecek beklentileri(2025)
- Detente dönemine doğru: Johnson Mektubunun ardından Türk dış politikası(2021)
- Geç Antik Çağ'da Aşağı Tuna: Histria örneği(2023)
