End to end delay analysis of MPLS networks for different parameters
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
This thesis analyzes the End-to-End Delay of Multiprotocol Label Switching (MPLS) networks for different parameter values. The contributions of MPLS, Traffic Engineering (TE), and Quality of Service (QoS) services to the overall network efficiency and performance are discussed. The effects of different parameters provided by the Reference study on the total End-to-End Delay are analyzed, as well as the effects on the variable and constant delay factors of multimedia data packets (e.g., voice data). In this thesis, the effects of different parameter values on the total End-to-End Delay of our reconfigured network are described in detail through MATLAB simulation and graphical analysis. The study aims to provide results to be used for performance improvement and to provide efficient services in MPLS networks by minimizing delays and traffic optimization with various scenarios. Keywords: MPLS, End-to-End Delay, quality of service (QoS), Traffic Engineering (TE)
Author
Alaa Ayad Jumaah
Institution
Çankaya University
Elektrik Elektronik Bilim Dalı
How to Cite
Alaa Ayad Jumaah (Master Thesis). End to end delay analysis of MPLS networks for different parameters, 2024, Çankaya University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Çankaya University
- Investigation of amazon and google for fault tolerance strategies in cloud computing services(2015)
- Investigation in MYSQLdatabase and NEO4J database(2015)
- Principal intervention in Civil Procedure Law(2018)
- Exchange rate and inflation relationship: The case of Turkey(2023)
- Effects of the economic news on herd behavior(2023)
- Experimental analysis of effects of different network parameters on TCP / IP networks(2025)