Identifying the factors affecting conceptual cost estimation of construction projects in volatile economies
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
The construction industry plays a vital role in the country's economy. Increasing the success rate of construction projects has become more important, especially, in volatile countries. For that matter, conceptual cost estimation is used from the very first point of the project, when the feasibility study is done. After that, when more detailed information is available, more accurate cost estimation is done with the help of the project design. In countries with volatile economies, predicting project costs beforehand is challenging due to economic fluctuations, resulting in more uncertainties when starting a construction project. Accurate conceptual cost estimation can help project owners overcome cost overruns and face economic instabilities. This study proposes a method for conceptual cost estimation for construction projects using historical data analysis as the foundation for creating a connection between the primary factors influencing the cost of building projects to produce estimations for new projects in Turkey. The goal of construction conceptual cost estimation is to predict the cost of a construction project, including all temporary expenditures generated throughout the construction process, and to serve as a basis for budgeting, planning, and decision-making. This paper uses quantitative data analysis methods such as Neural Network, Decision Trees, and Regression to develop a cost model using the historical data of construction projects in Turkey. The models' accuracy was then evaluated by measuring the mean absolute percentage error. The effect of design and economic factors which were used as the input of the cost modes were then discussed in this study. This study further suggests using the economic factors alongside the design factors to develop more accurate cost models.
Author
Ronak Sadeghıan
Institution

Boğaziçi University
Division of Civil Engineering
How to Cite
Ronak Sadeghıan (Master Thesis). Identifying the factors affecting conceptual cost estimation of construction projects in volatile economies, 2023, Boğaziçi University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Boğaziçi University
- Investigating the factors affecting the acceptance of generative artificial intelligence in business intelligence applications(2025)
- Nükleer güç, emek ve çevre: Akkuyu NGS(2023)
- Behind the gallows: Capital punishment, law, and legislative performance in Turkey (1926-1990)(2025)
- Exploring the values for nature, nature connectedness, pro-environmental behaviour, and well-being: A case study on urban park visitors in Istanbul(2025)
- An assessment on the role of regional development agencies in environmental governance in Türkiye: A case study on Thrace Region(2025)
- From the movement of '68 to the rupture of '71: The transformation of student protests in Turkey(2025)