Time-cost optimization in construction projects; Case study at al-Anbar hospital
2020
0 views
0 downloads
Advisor: Dr. Öğr. Üyesi Oğuzhan Yavuz Bayraktar
Abstract (EN)
Optimization of time and cost in construction projects has been subject to extensive research since the development of the Critical Path Method (CPM). Many researchers have investigated various versions of the well-known Time-Cost Trade-off (TCT) problem, including linear, convex, concave, and also the discrete (DCTC) version. Traditional methods, in the literature for optimizing time and cost of construction projects range from mathematical methods to evolutionary based ones, such genetic algorithms, particle swarm optimization, ant-colony optimization, and leap frog optimization. However, none of the existing research studies has dealt with the optimization of projects in which any small saving would be significant. Traditional approaches have all been applied to projects of less than 100 activities which are far less than what exists in real-world construction projects. The objective of this study is to utilize recent developments in computation technology and novel optimization techniques such as Constraint Programming (CP) to improve the current limitations in solving DTCT problems. This research investigated the complex nature of time and cost optimization in construction projects. The traditional optimization methods of solving TCT problems, such as mathematical programming and evolutionary-based methods were examined and their inefficiency in solving large TCT problems was verified. The major outcome of this study is that the initial experimentations using mathematical and evolutionary-based optimization methods demonstrated the need for a considerable amount of time for these methods to find a feasible solution before starting to improve them. Thus, the decision variables were initialized with the most crashed mode of construction for all the activities to ensure that the experimentations initialized with a feasible solution will reduce the required time of finding the initial feasible solution. KEYWORDS: Industrial Engineering, Project Time-Cost Problem, Critical Path Method, Optimization, Evolutionary Computation. March 2020, Page, 81 Science Code: 90
Author
Saad Khaldon Rasheed Al Ubaıdy
How to Cite
Saad Khaldon Rasheed Al Ubaıdy (Master Thesis). Time-cost optimization in construction projects; Case study at al-Anbar hospital, 2020, Kastamonu University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Kastamonu University
- Investigation of pre-school teacher candidates' mental models for the concept of biodiversity(2023)
- Examining the relationship between religious attitude, self-regulation, free will, and determination(2023)
- Mental models of day and night concepts of primary school fourth grade students(2022)
- Compliance with standards and the contribution of certification to brand value: A research in Kastamonu building materials sector(2023)
- Exegesis of Ahzâb 37. verse(2023)
- The effects of the Presidential Government System on the organizational structure of public administration(2023)