Investigation of Delays in Construction Projects: The Case of Jordan-Amman
2020
0 views
0 downloads
Advisor: Tolga (Supervisor) Çelik
Abstract (EN)
Delays in the construction could be defined as a delay in project delivery according to the plan presented during the specified time. The issue of development delays is a worldwide marvel, numerous specialists have led a few investigations to discover the fundamental factors and reasons of postpone causes. It is a standard in the development business that accomplishment of the conveyed venture is estimated by; the timetable season of the specific undertakings inside the cost issues and as per the pre-depicted guidelines of required quality. Consequently, it is imperative to recognize and arrange the potential factors that cause delays during the conveyance of the undertaking. As of recently, numerous investigations are closed and a lot more are as yet under advancement to distinguish the variables causing delay in development extends nonetheless, in handy terms, Jordanian development industry experts despite everything experiences absence of mindfulness on the reasons for venture delays henceforth, no successful insurances are thought of. The postponements in development must be decreased if their sources are known. Thusly, this investigation intends to explain the variables that can bring about development time-expansion and discover arrangements of augmentation time issues in the business of development in Jordan. Inside this unique circumstance, thinking about the social and social habits of the business experts, a framework is proposed with the intention of breaking the squares of traditionally adopted project management principles of Jordanian construction industry professionals. In this research, with the help of conducted questionnaire targeting competent authorities and other stakeholders, project delay factors are identified and grouped based on their roots. This study revealed that, the most critical factors that lead can be resulted in delays in Jordan such as; Delay for interim budget of the owner/client to contractors and the difficulties of providing funds into projects by the contractors. Client-related delays, in this study was determined as a serious problem that can result in delay such as; designing issue, and labors related delays. In addition, the period of the project and cost overruns are the typical consequences in time extension. In Jordanian construction companies ignore the causes of delays until they actually occur and unavoidably, when this happens, it becomes too costly to reschedule as wasted time can never be recovered. For this reason, a framework will be created, along with proposing appropriate solutions to these delays to contribute to quick decision-making before or after the occurrence of these delays.
Author
Dr. Abdallah Ahmad Yassin
How to Cite
Abdallah Ahmad Yassin (Master Thesis). Investigation of Delays in Construction Projects: The Case of Jordan-Amman, 2020, Eastern Mediterranean University, Department of Civil Engineering.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Eastern Mediterranean University
- An Investigation on Time and Cost Overrun in Construction Projects(2012)
- Radial Power-Law Position-dependent Mass, Cylindrical Coordinates, Spectral Signatures(2015)
- Predicting performance level of reinforced concrete structures subject to corrosion as a function of time(2012)
- Discussion of Conservation Approaches for the Selected Heritage Buildings in the Walled City of Famagusta(2019)
- High School Students' Learning Styles in North Cyprus(2011)
- Afyonkarahisar İl Merkezinde Yaşayan 18 Yaş ve Üzeri Kadınların Diyet Posasıyla İlgili Bilgi Düzeylerinin ve Posa Alım Miktarlarının Belirlenmesi(2018)