A hybrid solution approach under the resource constraints for maintenance scheduling problem
2008
0 views
0 downloads
Advisor: Prof. Dr. Emin Gündoğar
Abstract (EN)
One of the major functions of a maintenance planning system is the ability of preparing the list of the Preventive Maintenance tasks to be performed in the next period together with indicating time, labour, materials, and tools feasibilities and priorities. So, maintenance scheduling can balance labour needed and can provide forecast for labour force that is going to be needed in the future. It is obviously possible to reach high degrees of performance with a good scheduled maintenance plan.Since scheduling is a NP-Hard problem, heuristic algorithms is preferred in the solutions of scheduling problems instead of analytical approaches. Genetic algorithms are quite efficient in scheduling problems of different sizes and gives successful results in obtaining feasible and better solutions. If it is not possible to perform the maintenance tasks in the time they are supposed to be conducted because of resource constraints (maintenance personnel) in scheduling problems, it is necessary to behave based on right criteria in deciding which tasks could be moved forward, which tasks could be postponed, or which tasks can not be delayed.In the system developed within this study, every preventive maintenance tasks in any given time space is represented as a gene. Lining up the genes in a row, chromosomes are composed that each one is a candidate for the solution. In the study, using the chromosomes in various arrangements considering the resource constraints, a genetic algorithm based solution technique is developed in order to assign tasks to previously defined dates taking account their priorities. Fuzzy Logic approach is preferred in defining priorities of preventive maintenance. The results of the developed algorithm in various sizes are compared with the test results of the traditional methods in various sizes.Keywords: Preventive Maintenance Scheduling, Genetic Algorithms, Fuzzy Logic
Author
Dr. Fuat Şimşir
Institution
How to Cite
Fuat Şimşir (Doctorate thesis). A hybrid solution approach under the resource constraints for maintenance scheduling problem, 2008, Sakarya University, Endüstri Mühendisliği Bölümü.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Sakarya University
- The Severity Of Premenstrual Syndrome in Women Using and Not Using Vitamin D(2025)
- Computational investigation of battery materials using density functional theory(2023)
- Mawlana Yaqub-i Charkhi And His tafsir(2024)
- Haci Ahmed b. Seyyid al-Bigavî and Tarjama al-Awārif al-maārif (sections of 22-43)(2024)
- Synthesis of carbazol substituted 3,4-dihydropyrimidine-2(1h)-thione deri̇vati̇ves(2024)
- Classification of recyclable wastes with deep learning models: A comparison on the effect of dataset size(2024)
