Production scheduling in identical parallel machines to minimize makespan with an application
2019
0 views
0 downloads
Advisor: Doç. Dr. Haluk Yapıcıoğlu
Abstract (EN)
In this study, the problem of scheduling identical parallel machines in the casting workshop of an armature producer has been discussed. To solve the problem, a 0-1 mixed integer mathematical model was developed to minimize the makespan. With the solution of the mathematical model developed for the multi-machine case, it is determined which jobs will be assigned to which batch, which batch will be assigned to which machine and in which time interval and in which order. Due to the fact that the scheduling process needs to be completed in a short time and the mathematical models are ineffective in solving large-scale problems, an algorithm has been developed to find very good solutions for this problem in a short period of time.
Author
Ebru Kiremitçi
Institution
How to Cite
Ebru Kiremitçi (Master Thesis). Production scheduling in identical parallel machines to minimize makespan with an application, 2019, Eskişehir Technical Üniversity.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Eskişehir Technical Üniversity
- Development of membrane containing lidocaine embedded nanoparticle helping prevention of peritoneal adhesions post-surgery with 3D bioprinter technology(2020)
- CuO nanoparticle green synthesis and composite film production with PVA matrix(2021)
- Effect of crystallographic orientation on ionic conductivity of Li(1+x)AlxTi(2-x)(PO4)3 solid electrolytes(2018)
- Removal of Congo Red by Sepiolite supported Aspergillus Fumigatus and Aspergillus Terreus(2019)
- Development of electrochemical sensor based on modified electrode for the determination of carbendazim(2020)
- Synthesis and characterisation of short chain length (SCL) polyhydroxyalkanoate (PHA) from Bacillus and formulation of it with collagen(2020)
