Analysis of project profitability and schedule overruns using system dynamics: A case study of trigeneration project
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
Combined heat and power systems also known as trigeneration and cogeneration system are capable of providing electricity, heating and cooling powers using one fuel simultenaously. Even natural gas, biogas and land fill gas can be used as fuel for these systems, natural gas is the most popular and common fuel in the market due to accessbility and sustainability of natural gas. Biogas and land fill gases are often used for the projects without having heat recovery that means selling energy to grid only. Trigeneration systems are so complex and require interdisciplinary engineering study and site coordination to establish. Addition to these, effective project management is must because of requiring high investment cost which brings high risk inherently. Generally it can be said that, every project would become succesful if budget and schedule targets are achieved. In our days, competition on industry is increasing and it is specified in previous studies that budget and schedule overruns based on planned will be most probably realized for complex construction project with turn-key agreement. It is assumed that in traditinal project management approcahes, whole project can be controlled when each element can be understood itself. But relationship between project components are more complicated than specified in traditional project management approaches,. In this research, the factors that effect budget and schedule overruns of a trigeneration system projects and relationship between these factors will be specified using system dynamics approach. Then a simulation model referring this project will be created. With running the simulation the factors mentioned above will be analyzed. Thus reduction of gap between planned budget and schedule targets and budget and schedule values at completion is foreseen and it is aimed that this model will be used by project managers as a decision support system.
Author
Ali Fırat Elçi
Institution
How to Cite
Ali Fırat Elçi (Master Thesis). Analysis of project profitability and schedule overruns using system dynamics: A case study of trigeneration project, 2018, İstanbul Arel University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from İstanbul Arel University
- ―Frankfurt Ekolü ve İngiliz Kültürel Çalışmalar Okulunun Karşılaştırılmalı Bir Okunması(2018)
- The examination of relation between parental attitudes and social emotional adaptation of primary school first grade students with and without diagnoses as gifted(2017)
- Usage of coca-cola and pepsi-cola brands in advertisement(2017)
- Institutional subject and management in health care(2017)
- Hats in the Ottoman society and reflection on the Ottoman poetry(2017)
- Market research impacts on the advertising industry(2017)