Türk Hava Kuvvetleri'nde fabrika seviyesi koruyucu bakım
Bu tez size mi ait?
Bu kayıt toplu arşivden geldi. Sizinse profilinize bağlayın.
Özet (EN)
In this thesis, we study the Factory Level Preventive Maintenance Problem(FLPM) experienced by Turkish Air Force (TUAF). This problem is a speciï¬ccase of Nonpreemptive Resource Constrained Multiple Project Scheduling withMode Selection (NRCMPSMS); allocation of limited resources to competingactivities of multiple project of diï¬erent types in which the duration of an activityis determined by the mode selection and the activity ï¬ow is dependent on thetype of the project. The objective is to determine the start (ï¬nish) time andthe mode of each project?s each activity so that the minimal total weightedtardiness and total incurred cost are obtained. We proposed a heuristic for thisproblem deï¬nition which is composed of two phases and apply it to a real lifeproblem experienced by TUAF. In the ï¬rst phase, the aim is to construct aninitial schedule with minimum total weighted tardiness and in the second phase,this schedule is improved in terms of total incurred cost by the mode selectionexchanges. Since the activity due date information is not available but requiredin prioritization of the activities, we develop ï¬ve FLPM speciï¬c activity due dateestimation methods. We run the proposed heuristic for three diï¬erent weightiiiï¬gures which are determined by the Analytic Hierarchy Process and the onebeing used by TUAF. In addition, we study the inï¬uence of the release and thedue dates of the aircrafts on the objective functions. We propose a determinationmethod for each of the release and the due dates that aims ï¬nding the tightnesslevels of these two parameters. The release date determination method thatwe propose relates the arrival rate of the aircrafts with the utilization of thebottleneck resource whereas the due date determination method that we proposerelates the due dates of the aircrafts with the fraction of the number of tardyjobs in percentages. We investigate the performance of the activity due dateestimation methods in terms of the objective functions and the computationaleï¬ort required by the tightness levels of the release and the due date that arefound by the determination methods that we propose.Keywords: Resource constrained project scheduling, multiple projects, modeselection, project types, weighted tardiness.iv
Yazar
Nuriye Ünlü
Kurum
Bu Yayına Nasıl Atıf Yapılır
Nuriye Ünlü (Master Thesis). Türk Hava Kuvvetleri'nde fabrika seviyesi koruyucu bakım, 2006, İhsan Doğramacı Bilkent University.
Anahtar Kelimeler
Lisans
Tüm Hakları Saklıdır
Bu eser belirtilen lisans koşulları altında paylaşılmaktadır.
İhsan Doğramacı Bilkent University tezlerinden daha fazlası
- Osmanlı Devletinde vergi ve vergi etrafında oluşan ilişkiler üzerine bir çalışma (16.-17. yüzyıllar)(2019)
- Rastsal kümeler ve choquet-tip temsiller(2021)
- Petrol fiyatları ve getiri eğrisi(2024)
- Yalnız yaşamak: Yollar, deneyimler ve gelecek beklentileri(2025)
- Detente dönemine doğru: Johnson Mektubunun ardından Türk dış politikası(2021)
- Geç Antik Çağ'da Aşağı Tuna: Histria örneği(2023)
