Project management in ship building industry and a sample project manegement plan
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In our country and in the world, shipbuilding industry has been the one of the most affected sectors by the economic crises in recent years. Competitive atmosphere including competing firms to take a share from tightening both domestic and foreign markets, obliged these firms to produce more quality and lower-cost goods/services than their competitors. This condition implies firms to move away from their classic undertaker mentality, and running and using of the resources they have efficiently. Today, as in all sectors, also within shipbuilding sector, project management systems established in conjunction with contemporary management mentality, enables shipyards to fulfil their complicated activities planned, organized and controlled; to accomplish assumed projects within prescribed period, quality and cost. In the scope of this thesis, information about project (management) plan and preparation is being instructed by emphasizing project management system concept mentioned above sample project examined in the perspective of project management, project management plan will be created. As a main source of the problems; as a result of understanding the project management systematic inadequately and because of planning culture deficiency, it is determined that moving to execution process before project (management) plan is prepared. It is explained that how important the project (management) plan has about solving problems by putting forth assertion about problems will be solved through project (management) plan. Within this study, it is tried to be done that introducing the project management systems which have not become widespread among the shipyards in our country sufficiently, ensuring firms to have corporate identities and effective management mentality by creating planning consciousness among them. Moreover, it is aimed that this will also be a step for the shipyards to execute contracted projects more effectively and to establish a planning department within its constitution for the purpose of ensuring efficiency by the standardization of project management function and to develop computer-assisted project management system.
Author
Fatih Gök
Institution
How to Cite
Fatih Gök (Master Thesis). Project management in ship building industry and a sample project manegement plan, 2013, Yıldız Technical University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Yıldız Technical University
- A ruled-based software model in the preliminary design phase of housing: Example of Mardin(2008)
- An investigation on the relationship between problem solving and critical thinking skill, and academic achievement of vocational and technical high school students(2017)
- Numerical investigation of single bubble flow boiling both on a flat surface and on a cavity in horizontal pipe and pool boiling on a flat surface(2018)
- Examination of the categories in which buildings with LEED v3 and v4 certificates score the lowest points in Turkey(2018)
- Examining ?Historical housing structures" within the confines of protecting ecological balance(2012)
- A strategic approach in the context of developing urban quality; the conceptual model proposal of urban design guideline(2015)