Master'sOpen Access

Planning construction projects with network diagrams and cost management

2003
0 views
0 downloads
Advisor: Doç. Dr. Recep Kanıt

Abstract (EN)

11 PLANNING CONSTRUCTION PRJECTS WITH NETWORK DIAGRAMS AND COST MANAGEMENT ( M.Sc. Thesis ) LATİF ONUR U?UR GAZİ UNIVERSITY INSTUTE OF SCIENCE AND TECHNOLOGY December 2003 ABSTRACT In this study, construction cost of Ankara Aşı Serum ve İlaç Kontrol Instute building is evaluated taking into account of work programs and manpower. In cases of taking back the construction completing time by %5, %10 and %15 earlier; manpower costs for each persentege ammount evaluated. For each time shortage a new work programme is prepared, manpower costs calculated, necessary programs worked out and time-cost comparision are made. During preparation of investment programme of this project different planning for different conditions are made and by making time, resource and cost analyses for each planning preference, the most racional one will be prefered in micro and macro scales. Science Code Key Words Page Number Adviser 966 Planning, Scheduling, Cost CPM, Gantt 97 Doç. Dr. Recep KANIT

Author

Dr. Latif Onur Uğur

How to Cite

Latif Onur Uğur (Master Thesis). Planning construction projects with network diagrams and cost management, 2003, Gazi University.

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Gazi University