The usage of motivation tools in project management and its implementation in the Turkish construction sector
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In this research, ?The usage of motivation tools in project management and its implementation in the Turkish Construction Sector? has been studied in great detail. A survey in regard to this study has been analyzed with respect to the people in this sector. The result of the work, it is achieved that neither the mean of the motivation is absorbed nor it?s been properly in use. It is found that the only respect to the general business work tips has pointed to be not enough for Civil Engineering Sector in nowadays. From the discussion of these findings, solutions to overcome these problems have been proposed and further considerations are given.
Author
Hüseyin Çağlar Çöğür
How to Cite
Hüseyin Çağlar Çöğür (Master Thesis). The usage of motivation tools in project management and its implementation in the Turkish construction sector, 2010, Çukurova University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Çukurova University
- An investigation of violent and nonviolent adolescent' families in terms in terms of family fuctioning, anger and anger expression(2006)
- Adolescents who have single parents family and full family were compared in respect to their life satisfaction and quality of life(2009)
- Assessing morphological and genetic diversity among traditional African eggplant landraces and detecting salt tolerance and anther culture performance of selected accessions(2022)
- The effects of collaborative video-blog projects on Turkish EFL students' linguistic and digital literacy skills(2025)
- Cultural significance in foreign learning and teaching with special emphasis on reading comprehension through cultural schemata(1992)
- Credit risk management in banking sector: An application of variables determining credit risk in Turkish banking sector(2011)
