Abstract (EN)

A computer program called Hydropower Plant Site Assessment Program (HPSAP) is developed by using Visual Basic Programming with visual application interface in Microsoft Excel to assess the hydropower potential in river basins. A searching algorithm methodology to select optimum site to install the run of river hydropower plants is developed according to hydrological, metrological and economic criteria. HPSAP has several options to analyze the watershed for different head or power criteria. HPSAP has ten application forms to input the searching requirement criteria and eight outputs tables with one basin map to screen the locations of proposed plants. HPSAP estimates the locations coordinates and upstream drainage area for powerhouse and weir locations, elevation of powerhouse and weir, distance from weir to powerhouse, approximate penstock length, design head and generated power for each proposed run of river hydropower plants. HPSAP uses a flow duration curve mathematical expression developed by Gene expression programming to estimate the design discharge for the plant based on rainfall runoff model outputs. HEC-HMS model is used as hydrological rainfall runoff model in this study. The results prove the efficiency of the program to assess the hydropower potential in river basins. Hurman River in Turkey is selected to test the proposed program. The results indicated that the optimum hydropower potential of Hurman River ranged from 10200 to 19700 kW for flow frequency ranging from 20% to 80% and total project efficiency 85%. Keywords: Rainfall-runoff modeling, Gene expression programming, Visual Basic programming, Flow duration curve, Hydropower plant.

Author

Anas Mahmood Al Juboorı

How to Cite

Anas Mahmood Al Juboorı (Doctorate thesis). Integrated hydrological model with visual basic programming for hydropower potential assessment in ungauged watersheds, 2017, Gaziantep University.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Gaziantep University