Reflections of recent changes in public tender system on time and cost of construction investements
2006
0 views
0 downloads
Advisor: Prof. Dr. M. Emin Öcal
Abstract (EN)
In the present study, the articles of nation procurement law number 2886 which was valid as of January 1st 1984 and public procurement law number 4734 which was be valid as of January 1st 2003 were thoroughly targeted by the method of comparison between them.In addition to this with abstracting of public construction projects according to each articles of public procurement during term of implementing to them, compared time and cost changing.Thus, it accessed some significant inventions which enable to contributing to use public resource efficiently, aware of tender law number 4734.
Author
Nuray Turhan
Institution
How to Cite
Nuray Turhan (Master Thesis). Reflections of recent changes in public tender system on time and cost of construction investements, 2006, Çukurova University, İnşaat Mühendisliği Bölümü.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Çukurova University
- The effects of collaborative video-blog projects on Turkish EFL students' linguistic and digital literacy skills(2025)
- Credit risk management in banking sector: An application of variables determining credit risk in Turkish banking sector(2011)
- Assessing morphological and genetic diversity among traditional African eggplant landraces and detecting salt tolerance and anther culture performance of selected accessions(2022)
- A comprehensive study on indirect evaporative coolers: CFD-based performance analysis, geometric optimization and machine learning models(2025)
- Kazal's of Moldo Kılıç (Phonetical, morphological studies - text-translation)(1998)
- Toplam kalite yönetimi ve Çukurova bölgesindeki tekstil işletmelerindeki uygulamaları(1998)
