Reflections of recent changes in public tender system on time and cost of construction investements
2006
0 görüntülenme
0 i̇ndirme
Danışman: Prof. Dr. M. Emin Öcal
Özet (EN)
In the present study, the articles of nation procurement law number 2886 which was valid as of January 1st 1984 and public procurement law number 4734 which was be valid as of January 1st 2003 were thoroughly targeted by the method of comparison between them.In addition to this with abstracting of public construction projects according to each articles of public procurement during term of implementing to them, compared time and cost changing.Thus, it accessed some significant inventions which enable to contributing to use public resource efficiently, aware of tender law number 4734.
Yazar
Nuray Turhan
Kurum
Bu Yayına Nasıl Atıf Yapılır
Nuray Turhan (Master Thesis). Reflections of recent changes in public tender system on time and cost of construction investements, 2006, Çukurova University, İnşaat Mühendisliği Bölümü.
Anahtar Kelimeler
Lisans
Tüm Hakları Saklıdır
Bu eser belirtilen lisans koşulları altında paylaşılmaktadır.
Çukurova University tezlerinden daha fazlası
- The effects of collaborative video-blog projects on Turkish EFL students' linguistic and digital literacy skills(2025)
- Credit risk management in banking sector: An application of variables determining credit risk in Turkish banking sector(2011)
- A comprehensive study on indirect evaporative coolers: CFD-based performance analysis, geometric optimization and machine learning models(2025)
- Kazal's of Moldo Kılıç (Phonetical, morphological studies - text-translation)(1998)
- Toplam kalite yönetimi ve Çukurova bölgesindeki tekstil işletmelerindeki uygulamaları(1998)
- A Model for effective supervision from the supervisor and the student-teacher`s perspective: A social constructivist approach(2003)
