DoctorateOpen Access

Estimating project duration based on cost in public projects

Is this your thesis?

This record came from a bulk archive import. If it’s yours, link it to your profile.

Abstract (EN)

The construction sector, as one of the fastest growing ve most critical sectors worldwide, is faced with great challenges in project policies ve cost estimations. Especially in public projects, considering the importance of budget ve time management becomes a great necessity in accurate duration estimation. This can be done by examining the data obtained from public projects in Turkey, Australia, Nigeria, Texas ve other regions, with cost-based duration estimation methods. In addition to traditional approaches such as linear regression ve Bromilow model, artificial intelligence techniques, especially artificial neural networks (ANN), will be used to perform estimations. It is anticipated that artificial neural networks will provide more accurate results compared to the traditional distribution in complex units between cost ve duration. As a result, more effective use of ANN will be contributed to calculating estimated amounts during the duration of projects. Thus, the completion of public projects can be estimated better ve more effectively, ve the efficient use of public resources can be increased.

Author

Mehmet Sena Kaşka

How to Cite

Mehmet Sena Kaşka (Doctorate thesis). Estimating project duration based on cost in public projects, 2025, İstanbul Gelişim University.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from İstanbul Gelişim University