Kanban kontrollü montaj sisteminın çizelgesi için simülasyon modellemesi ve analizi
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In today's industrial world, the scheduling for assembly systems is a significant issue, keeping industrial companies on a competitive edge. Flexibility indicates a manufacturing and assembly system's capability to act in response efficiently and rapidly to the trends of market, that have become more dynamic and unpredictable, up to now, the research efforts dealing with scheduling problems in assembly lines have been inadequate. There are two main problems with these studies: (1) all the studies of scheduling for assembly lines concentrated only on single-product assembly environments; (2) all these studies have neglected dynamic events and only concentrated on static situations. In light of those limitations, a new plan for tackling scheduling issues in assembly lines will be presented in this thesis. Due to the complexity of achieving this aim, there will be 3 stages to define the architecture of the developed strategy. The 1st stage focuses on the development of a novel method for scheduling assembly lines in a multi-product assembly environment under a pull control mechanism. The 2nd stage focuses on the development of an intelligent method for scheduling for assembly lines in dynamic situations by using kanban control. The 3rd stage focuses on extending the developed method for the purpose of optimizing dynamic scheduling of assembly lines for multi-objective problems. The 3 stages are implemented through using a grouping of advanced solution methods including Taguchi optimization approach, Kanban control system modelling and simulation. Two case studies are presented in this thesis for demonstrating the robustness and effectiveness of the suggested scheduling strategy. The first case study is to prove that the developed methodology (first step) can concurrently assemble multi-products; the second case study is to verify and validate the proposed approach (second and third steps) for multi objective optimization regarding the tasks of dynamic scheduling. The results of the case studies show that the new method is effective and practical in assembly lines setting. Thus, the current study can be considered as a main factor in the direction of solving scheduling problems of kanban controlled assembly lines.
Author
Abdaala Abdulmuhsen Habıb Al-jebur
How to Cite
Abdaala Abdulmuhsen Habıb Al-jebur (Master Thesis). Kanban kontrollü montaj sisteminın çizelgesi için simülasyon modellemesi ve analizi, 2019, Altınbaş University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Altınbaş University
- The comparison of Samuel P. Huntington's "Clash of Civilizations" and Immanuel Wallerstein's "World Systems Analysis"(2024)
- Energy efficient protocols for stable clustering in heterogeneous wireless sensor networks(2019)
- Algının fenomenolojisi: Görsel mekânın algılama(2024)
- The effects of symbolism on 21st century jewelry design(2025)
- Evaluation of the factors affecting the choice of child oral care products and the attitudes of parents to these products(2023)
- Mediating role of psychological resilience in the relationship between childhood emotional abuse and depression(2023)
