Geotechnical problems and solution proposals of Karaman – Ulukisla high speed train route and engineering structures
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In this master thesis study, the problems encountered in Karaman - Ulukışla High Speed Train railway route and in the engineering structures and the applications related to the solutions were included. Within the scope of the study, the lithology of the railway line between KM: 139 + 100 - 139 + 750 and KM: 160 + 450 - 160 + 850 was investigated, bearing capacity, elastic and consolidation settlement, liquefaction analysis were performed. In order to solve the geotechnical problems detected on the railway line; deep mixing column, jet grout column, stone column, rock fill alternatives have been investigated, and the engineering calculations of the improved soils which can be applied and economically feasible are executed analytically and numerically. The railway - highway intersections at KM: 201 + 934, the top - down system application were described for the elimination of level crossing and the construction phases were analyzed with PLAXIS 2D computer program. As a result of the analyzes, the deformations expected to occur were determined and suggestions were given.
Author
Arif Emre Kaan Gündoğdu
How to Cite
Arif Emre Kaan Gündoğdu (Master Thesis). Geotechnical problems and solution proposals of Karaman – Ulukisla high speed train route and engineering structures, 2019, Konya Technical University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Konya Technical University
- A study on the preparation of block planning principles in land consolidation projects(2023)
- Deep learning based visual and inertial data fusion for uav localization in case of GNSS signal losses(2025)
- Comparison of some manufacturing costs according to various analysis parameters and other regulations of reinforced concrete structures with different floor systems(2018)
- Evaluation of the rail transportation network relations with urban transformation projects by the traffic impact analysis method: A case study of the old industry in Konya(2019)
- Ahmet Hilmi Nalçacı as a leading person in the development of municipality in Konya(2019)
- The use of olive seed powders in vehicle brake pads and investigation of wear properties(2019)
