Certification dependent work scheduling model proposal in the welding process
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
The rail systems industry is a sector characterized by a wide variety of products, complex production activities, and high customer quality expectations. As a result, profitability is low for manufacturers of sub-components in the industry, and competition conditions are challenging. Therefore, it is crucial for manufacturers producing sub-components for the rail systems industry to effectively leverage the high-cost and limited workforce. In this context, the utilization of scientific approaches in workforce planning is necessary. This would lead to a reduction in defects, late deliveries, and inventory holding costs while increasing capacity. This thesis study aims to minimize the total delay and early completion times within the scope of delivery dates in a company that performs product manufacturing for rail systems using welding processes. To achieve these goals, a Mixed Integer Linear Programming (MILP) model has been used. In the company, the welding operators have welding competency certificates based on the type and thickness of the raw material. Consequently, not every welding operation required for each product can be performed by any welding operator. This situation leads to either prolonged waiting time for the parts that need welding or the operator finishing the job(s) early and having idle time. The proposed mathematical model considers constraints such as worker-competency control, worker availability control, setup time between two welding operations, and the assignment of each welding operation to only one operator. Additionally, the mathematical model utilizes actual data obtained from the company. The study results indicate that the proposed model provides better results than the current situation in the company. The study is considered to be useful for the literature and practitioners in the manufacturing sector in terms of assigning tasks and scheduling based on worker competencies.
Author
Temmuz Can Gezer
Institution
How to Cite
Temmuz Can Gezer (Master Thesis). Certification dependent work scheduling model proposal in the welding process, 2023, Başkent University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Başkent University
- Classification of aircraft images(2025)
- A nietzschean reading of cormac Mccarthy's Blood Meridian Or the Evening Redness in the west and The Road(2021)
- An analysis of the alignment of English textbooks in Turkish primary schools with the 21st century skills(2025)
- The gastronomic heritage of tradesmen's restaurants: The case of Ankara(2025)
- The impact of vocational education on the skilled labor shortage: A study on the construction sector in Ankara province(2025)
- The effects of bankruptcy on litigation and follow-up processes(2019)
