A solution proposal for bus rapid transit line congestion problem
2017
0 views
0 downloads
Advisor: Yrd. Doç. Dr. Ümit Terzi
Abstract (EN)
In Istanbul BRT System, that constitute a good alternative to other public transportation modes in terms of capacity, speed and performance; the need for increased capacity has caused the need to develop various optimizations. In the city of Istanbul, approximately 800 thousand passengers are transported in BRT system per day. In this system, the return of benefit increases in terms of number of passengers and operating costs asymmetrically as the improvements takes place. In this study, scenarios are proposed for the development of BRT operating plan. In order to measure both the present condition and the performance gains as a result of improvements in the system, Visum simulation program, that has the ability to create macro simulations is used. Volume capacity ratios are calculated by taking the outcomes of scenarios and it has been revealed that the recommended scenario offers more successful results for BRT system to work with the highest benefit.
Author
Dr. Mehmed Sinan Pamuk
Institution
How to Cite
Mehmed Sinan Pamuk (Master Thesis). A solution proposal for bus rapid transit line congestion problem, 2017, İstanbul Beykent University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from İstanbul Beykent University
- I. Architect Vedat Tek within the framework of the national architecture movement(2025)
- No. 2 Muhimme Registry (963/1555) evaluation – transcription (S. 1-102)(2019)
- Investigation of the relationship between indecisiveness, resistance to change, and emotional self-efficiency in individuals aged 18-40(2022)
- A research on quality in urban spaces and urban design guides in the context of local identity(2017)
- Evaluation of pre-consumer waste in the Turkish ready-to-wear sector through sustainable design methods(2025)
- Analysis of design process of Galataport: An entrance gate to Istanbul(2018)
