Investigation of time and cost effects in project management with Building Information Modelling (BIM)
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
Project Management aims to prevent financial and time losses by creating a realistic work schedule. Accurate quantity takeoff data is crucial in this regard. With the advancement of the construction sector, large-scale complex structures are emerging, making the calculation of quantities time-consuming and prone to errors. Incorrect quantity takeoff data leads to unrealistic work schedules. Moreover, having numerous activities involved in the construction process makes it difficult to track the work schedule.Building Information Modeling (BIM) is a technological development and process that includes information such as quantity, time, and budget of the structure, enabling inter-team sharing of this information. The concept of 5D, formed by combining a three-dimensional (3D) model created with BIM with time (4D) and cost information, can address the mentioned problems.In this study, a public building was modeled in 3D using BIM-based software, and the quantity takeoff was calculated. Based on the quantity takeoff data, the cost was determined, and a work schedule was prepared. The prepared work schedule and the three-dimensional model were associated with different BIM-based software. The model's progression over time was monitored in a virtual environment, and cost analysis was conducted. Based on the results obtained, the advantages and disadvantages of BIM in Project Management during the planning phase were discussed.
Author
Burak Karakurumer
How to Cite
Burak Karakurumer (Master Thesis). Investigation of time and cost effects in project management with Building Information Modelling (BIM), 2024, Osmaniye Korkut Ata University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Osmaniye Korkut Ata University
- Carbon mineralization in soil added Suillus collinitus growing naturally on two different altitudes(2020)
- Data mining methods used to determine financial statement frauds and an application in Borsa Istanbul(2021)
- Drying of oat milk pulp enriched with phenolic content by solid-state fermentation using different methods(2025)
- Analyzing recourse cases in social security law related to construction works accidents(2015)
- Rewriting systems for some semigroup constructions(2015)
- Determination of radon ( Rn-222 ) concentration in drinkable and processed water in and around osmaniye(2015)