Schedule risks of green certified construction projects: A comparison between Turkey and the United States
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
Traditional construction methods, combined with increasing consumption trends, cause the depletion of natural resources. The expansion of the green building concept, which produces less waste, uses natural resources wisely and provides the highest level of comfort for its users, has emerged as a convenient solution to rapidly build sustainable cities and reduce damage to the environment by the industry. However, green buildings that require more complex construction processes than conventional projects have additional risks resulting with delays. In this study, the risks encountered in green building projects were investigated and the differences that may arise in the local construction sector in Turkey and the US were compared and evaluated. The information needed to be used in the analyzes was collected by reaching professionals with green building application experience both in Turkey and the US. The answers to the questionnaires prepared for this purpose have been obtained by online forms and individual interviews. In order to determine the risks included in the questionnaire, an extensive literature research was conducted first. Then, interviews with experienced people in the sector matured the risks identified and categorized into four main categories. These categories are determined as; materials, products and process risks, financial risks, legal and contractual risks and consultants and subcontractors risks. Thirteen different risk headlines have been examined under these categories. According to the analysis results, there are differences between the two countries, both on the basis of the main risk categories and on the basis of the risk headlines. According to the survey results, the three most important risk headlines in Turkey are: (i) contractors and subcontractors agreeing to standards that are not within their expertise and competence; (ii) lack of green construction experience and qualification; and (iii) lack of expertise in new products/technologies. On the other hand in the US, results are sorted as; (i) contractors and subcontractors agreeing to standards that are not within their expertise and competence; (ii) failure to receive materials/products in a timely fashion causing delays and (iii) lack of expertise in new products/technologies. These headings belong to the risk categories of consultants and subcontractors and materials, products and processes for both countries. With the other rankings of the headings taken into account, differences between the two countries, especially in response to the level of experience of the project sides, remained noticeable. It has emerged that Turkey is still trying to solve the problems in the planning phase with respect to the US, which is regarded as a pioneer country, and that the Turkish construction sector needs more time and incentives to adapt to the green building certifications. In addition, it was seen that the professionals in Turkey gave higher risk score answers than their US colleagues in all categories. This can be attributed to the urgent necessity of establishing a suitable system for adapting the green building certification to the construction culture in Turkey, and as a result, the increase in the number of experienced and qualified consultants/subcontractors, even though the systems based on foreign countries are tried to be applied. Careful consideration of these identified risks, especially during the planning phase, has a crucial importance to be able to avoid delays in green building projects. This study sets an example in terms of consideration of developed and developing countries' risk perspectives on sustainable construction concepts in a context dependent to the schedule.
Author
Hasan Gökberk Bayhan
Institution
How to Cite
Hasan Gökberk Bayhan (Master Thesis). Schedule risks of green certified construction projects: A comparison between Turkey and the United States, 2017, Yıldız Technical University.
Keywords
EN
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Yıldız Technical University
- Obtaining gold from one cyanide leaching method, enviromental problems and examples of Turkey (gold production in view Turkey)(2007)
- A ruled-based software model in the preliminary design phase of housing: Example of Mardin(2008)
- 19th-20th centuries apartment buildings in Şişli and Osmanbey(2001)
- An investigation on the relationship between problem solving and critical thinking skill, and academic achievement of vocational and technical high school students(2017)
- Numerical investigation of single bubble flow boiling both on a flat surface and on a cavity in horizontal pipe and pool boiling on a flat surface(2018)
- An analytical treatment on varied guitar transcriptions of Johann Sebastian bach's pieces for solo strings via first cello suite illustration(2018)
