Abstract (EN)

In this study, the job shop scheduling problem, which is classified as NP-hard, was addressed in a marble factory. With increasing competitive conditions, the efficiency and proper scheduling of production mechanisms have become crucial for factories. A mathematical model suitable for the structure and production style of the factory was developed as the solution approach. To overcome the difficulties encountered when order sizes increase, a Genetic Algorithm was employed. Job shop scheduling problems are common in production systems involving multiple machines and products. The focus of this study is to minimize order delays caused by setup operations due to processing changes between two machines. The mathematical model was built with constraints that serve this objective and align with the existing production habits. Genetic Algorithm, one of the most widely used heuristic algorithms, is based on permutation and evolutionary practices. While searching for better solutions to the problems, it accepts the results gradually and adheres to the idea of survival of the best solution. It includes the stages of natural selection, mutation, and crossover. It was applied for solving large-scale problems. Test problems were generated randomly using the factory's machine, product, and order data. While the mathematical model proved sufficient for small and medium-sized test problems, its efficiency was observed to decrease as the problem size increased. In large-scale problems, solutions were obtained using the Genetic Algorithm. For future studies, it is recommended to develop a multi-objective mathematical model and explore different parameter settings and mutation strategies for the Genetic Algorithm.

Author

Nurhayat Bahşi

How to Cite

Nurhayat Bahşi (Master Thesis). A heuristic solution proposal for minimizing total tardiness in make to order job shop production, 2025, Süleyman Demirel University.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Süleyman Demirel University