Creating health and safety management plan according to project schedule of residental construction projects, focusing on risk and cost
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
The construction sector in Turkey has an average of 2 million employees each year. The need for the construction sector in our country is increasing in parallel with the expanding population and growing economy. Unfortunately, the statistics of occupational accidents and occupational diseases, provided by Social Security Institution (SSI), are so high. For construction industry. Majority of the data indicates that simple and predictable causes of accidents occur in different projects repeatedly. Negligence or apathy related occupational accidents hinder the process of solving problems which could have been easily prevented by cost and effort effective planning. Construction projects generally start with excavation works, continue with reinforced concrete productions and facade productions and finally completed with fine work productions. For this reason, in construction projects, hazards related to excavation works are likely to take place first; then the hazards associated with reinforced concrete, facade and finishing works start to appear. Among the current Occupational Health and Safety (OHS) methods, one of the most forward-looking actions is risk assessment. Risk assessment includes the process of identifying the hazards that may occur by conducting an audit in the work environment and taking measures to prevent the threats from taking place. Construction phases of construction projects are very similar and most of the occupational safety risks are common to almost all of them. Therefore, determining OHS risks related to fine works before starting the project enables the employer to make a price/performance assessment for the measure to be taken with sufficient time to take the most accurate measures for the project. In addition, determining when the precaution will be taken will make the employer firm's budget more predictable. In this thesis, the risk assessment method and project management are combined to determine the foreseen hazards and to take the necessary precautions before the project starts Keywords: Health and Safety, Construction Project, Optimization, Risk Assessment, Project Management
Author
Kağan Erkek
Institution
Çankaya University
İş Sağlığı ve Güvenliği Bilim Dalı
How to Cite
Kağan Erkek (Master Thesis). Creating health and safety management plan according to project schedule of residental construction projects, focusing on risk and cost, 2019, Çankaya University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Çankaya University
- Investigation of amazon and google for fault tolerance strategies in cloud computing services(2015)
- Exchange rate and inflation relationship: The case of Turkey(2023)
- Effects of the economic news on herd behavior(2023)
- Experimental analysis of effects of different network parameters on TCP / IP networks(2025)
- Reconstruction of patriarchy through matriarchy: A critique of gendered power structures in Naomi Alderman's The Power(2025)
- Characterization of under-hood airflow in construction equipment using experimental techniques(2025)