Approximate rough construction cost estimation via the change of costrucrion parametres
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
Key Words: Building importance factor, Earthquake area, Soil class, Artificial neural nets, Static project, Approximate rough construction costToday, the most significance subject to take care in construction market is initially to secure the human life and besides, to obtain maximum efficiency with minimum cost. Therefore, to provide this, for which purpose it will be used and the site condition should be determined. In this study, two identical projects that are septuple and fifteen-storey are examined. The projects are designed according to four different earthquake zone (grade 1,2,3,4), four different soil class, (Z1, Z2 ,Z3 ,Z4 ) and four different building importance factor (1; 1,2; 1,4 ve 1,5) whose static and ferroconcrete analysis were done via IDESTATIC 6.2007 software. The aquired formwork, following the analysis, the reinforcement and quantities values programmed with artificial neural nets, approximate rough construction cost is estimated.
Author
Ümit Gülçiçek
How to Cite
Ümit Gülçiçek (Master Thesis). Approximate rough construction cost estimation via the change of costrucrion parametres, 2011, Sakarya University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Sakarya University
- Turkey according to the records of the House of Commons (1918-1922)(2011)
- Ömer Öngüt, his views and community through publications(2025)
- Mawlana Yaqub-i Charkhi And His tafsir(2024)
- Research of teachers' attitudes and self-efficacy perceptions towards distance education application(2024)
- Tiles in architect Vedat Tek's Istanbul buildings(2024)
- Financial performance evaluation and the relationship between stock returns: Hesitant Fuzzy AHP based approach(2020)
