Production plan design in fault controlled bench slopes instability in open pit coal mining-Eynez example
2019
0 views
0 downloads
Advisor: Prof. Dr. Ercüment Yalçın
Abstract (EN)
In this master's thesis, production plan design of an open pit coal mining, which was in Soma region Eynez basin, was conducted considering 378 drillholes and 12 faults' information on fault-controlled slope instability. Taking into consideration factors affecting production plan design, reserve amounts of Eynez Open Pit Mine were calculated using faults' locations, directions, dips and dip directions in cope with field's engineering jeology properties. In addition, producible reserves in areas between all the fault lines were calculated seperately and were compared relative to the reserve of the total open pit area. Reserve calculations were made relatively by using triangulation, inverse distance, kriging and polynomial modeling methods and results were compared.
Author
Dr. Mehmet Emre Kılınç
How to Cite
Mehmet Emre Kılınç (Master Thesis). Production plan design in fault controlled bench slopes instability in open pit coal mining-Eynez example, 2019, Dokuz Eylül University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Dokuz Eylül University
- AFAD gönüllülük sisteminin etkin müdahale açısından analiz(2020)
- The thoughts and practises of Atatürk's adopted daughter Afet İnan(2018)
- Determinants of the modified incremental step test in patients with bronchiectasis(2021)
- Economic crisis and Turkey are also organized crime(2020)
- CPAP tedavisi altında olan orta ve ağır obstrüktif uyku apnesi tanılı hastalarda, orofaringeal egzersizin etkinliği: Randomize kontrollü klinik çalışma(2020)
- Some former USSR contries and Azerbaijan in terms of tax load(2020)
