Project management application with dependency structure matrix
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
vPROJECT MANAGEMENT APPLICATION WITH DEPENDENCYSTRUCTURE MATRIX(M.Sc. Thesis)Kerem Murat KILIÇGAZI UNIVERSITYINSTITUTE OF SCIENCE AND TECHNOLOGYSeptember 2006ABSTRACTDesign management suffers from the lack of supply chain experienceand sensitivity, despite the fact that poor component and supplierchoices can have substantial negative impact on projectimplementation. Even less frequently does the upper management drivestrategic supplier selection during development of a new design, whichhas the potentially devastating effect of misaligning their projectroadmap with the roadmaps of key component suppliersReduction in costs as well as a decrease in time of the projects, whichare among the main targets of the company, are only possible byintegration of design and procurement taking into consideration thestrong cross-disciplinary iterative relationship between procurementand design. In this study, I aimed to develop an integrated design andprocurement plan for a real project in the light of an iterative approach.I begin with a literature survey about the current studies and finish withan integrated solution for a real project.Science Code : 906.1.119Key Words : Project Management, Design Structure MatrixPage Number : 87Adviser : Prof. Dr. Fevzi KUTAY
Author
Kerem Murat Kılıç
How to Cite
Kerem Murat Kılıç (Master Thesis). Project management application with dependency structure matrix, 2006, Gazi University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Gazi University
- Experimental development of the interfacial bond-slip model between textile reinforced mortar strips and masonry walls(2025)
- Occupational accident analysis and modelling in oil and gas drilling sector Turkey(2021)
- XVI. yüzyıl Anadolu'sunda Oğuzların Karkın Boyu(2004)
- The ideological construction of regime debate in Turkey by the press in the context of 2007 presidential elections(2012)
- Sharing of real life geometry samples via a social learning environment: A case study(2021)
- The use of verbal memory in the context of sustainability and power at the museums of Turk(2010)