Productivity analysis with work measurement in concrete building construction

2019
0 views
0 downloads
Advisor: Dr. Öğr. Üyesi Gözde Çelik

Abstract (EN)

Unit Price Analysis of the Ministry of Environment and Urbanization is often used as a preferred resource in determining the approximate cost of construction and in preparing the work schedule. Within the scope of this study, man hour values 11 work items, which are widely used in construction of reinforced concrete buildings, are calculated by work measurement and related information was collected from subcontractors. Man hour values calculated as a result of work measurement and subcontractor experiences are compared with the Ministry of Environment and Urbanization unıt price analysis data. As a result of the study, it is concluded that the Ministry of Environment and Urbanization data should be revised according to current technology.

Author

Özge Alboğa

How to Cite

Özge Alboğa (Master Thesis). Productivity analysis with work measurement in concrete building construction, 2019, Çukurova University.

Keywords

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Çukurova University