A reactive project scheduling approach and an apllication
2011
0 views
0 downloads
Advisor: Yrd. Doç. Dr. Ediz Atmaca
Abstract (EN)
Scheduling is a decision-making process which has a very important role in production and service systems that deals with assigning limited resources to specific tasks on the objectives. Reactive scheduling, is a repairing process on the corruptions which happens in the application of the schedule. Reactive project scheduling is consist of the repairing process of the initial schedules which corrupted by the deterioration. Instead of being done many studies on reactive scheduling on production systems, reactive project scheduling is seen that a small number of studies. Suggested solution methods by theese studies require a very high-level planning and software knowledge at real-life project manageres or is not feasible on large and complex problems which often encountered in real life.In this study, the reactive project scheduling approach is applied on a hydroelectric power plant project which in the scope of the resource constrained project scheduling problem. In application, within the project managament software packages which provides easier, fast, visual scheduling, Microsoft Office Project 2007 software and the Primavera Enterprise V.6.0 Project Management software were selected which is shown the capability of resource allocation. on the reactive project scheduling application the resource allocation capabilities of Microsoft Office Project 2007 software and Primavera Enterprise v.6.0 Project Management software?s is compared by the rule of project cost and completion time.By the resource constrained reactive project scheduling application, it is shown that the Primavera Enterpirse V.6.0 Project Management software has appropriate features as issue, thresholds and risk modules for reactive project scheduling and the resource allocation capability of Primavera Enterpirse V.6.0 Project Management software?s is higher than Microsoft Office Project 2007 software?s resource allocation capability.Science Code: 906.1.119Key Words: Reactive Project Scheduling, Resource Constrained Project Scheduling, Hydroelectric Power Plant ProjectPage Number: 143Adviser: Assist. Prof. Dr. Ediz ATMACA
Author
Dr. Sahil Dindar
How to Cite
Sahil Dindar (Master Thesis). A reactive project scheduling approach and an apllication, 2011, Gazi University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Gazi University
- Occupational accident analysis and modelling in oil and gas drilling sector Turkey(2021)
- XVI. yüzyıl Anadolu'sunda Oğuzların Karkın Boyu(2004)
- Sharing of real life geometry samples via a social learning environment: A case study(2021)
- Evaluatıon of calcium hydroxide removal efficiency of two different irrigation activation techniques from artificial internal resorption cavities prepared at different root levels(2021)
- Experimental development of the interfacial bond-slip model between textile reinforced mortar strips and masonry walls(2025)
- The use of verbal memory in the context of sustainability and power at the museums of Turk(2010)