Master'sOpen Access

Antalya-Burdur demiryolu T12 tünelinin jeolojik ve jeoteknik incelenmesi

2022
0 views
0 downloads
Advisor: Prof. Dr. Ali Rıza Söğüt

Abstract (EN)

Tunnels are underground structures constructed by cylindrical boring of the rock masses with certain proportions and methods. One of these methods is the New Austrian Tunnelling Method (NATM). The first and most important principle of this method is to preserve the strength of the rock mass and form a supporting circle in the surrounding rock mass around the tunnel. This method enables the construction of the tunnel to be both safe and economical.This paper aims to analyse geological and geotechnical properties of the 2045-meter span T-11 tunnel that is planned to be constructed within the scope of Burdur-Antalya high-speed railway project. In this study; the data from borings LSK-501, TSK-18, TSK-19 and discontinuity measurements were used. The laboratory results of these borings were also analysed. In total of five on-site discontinuity measurements were used in Dips v5.0 to generate the required data. The acquired data was used to analyse whether the limestone will be stable or unstable in the case of tunnel boring. The results of the analyses suggest that unstabilities are not expected. Evaluation of rock masses regarding the tunnel entrance was executed. In this study, the rock masses were evaluated with only Rock Mass Rating (RMR) calculation. In order to compute RMR values, LSK-501 boring data were used to calculate the uniaxial compressive strength and average point load strength. The limestone unit of Beydaglari Formation had an RMR value of 35 and was classified as a poor rock.

Author

Dr. Ece Eser

How to Cite

Ece Eser (Master Thesis). Antalya-Burdur demiryolu T12 tünelinin jeolojik ve jeoteknik incelenmesi, 2022, Konya Technical University.

License

Tüm Hakları Saklıdır

This work is shared under the specified license terms.

More theses from Konya Technical University