The study for settings hydraulic power plant
2007
0 views
0 downloads
Advisor: Prof. Dr. Mesut Gür
Abstract (EN)
Key Words: Hydroelectric Energy, Hydroelectric Foundations, The Selection Turbine, Dimentioning of Turbines This thesis is studied for generating electricity from Mudurnu River. A lake, in Munsurlar near Mudurnu River, is planned by waylaid of water with a regulator. Water gathered will be carried by pipelines from lake to a central headquarter set in Pazarkoy and electricty will be generated with units in the central headquarter. Topographical and geological and geodesical studies are complated in the area of pipelines where the Project is constitiued and hydroelectric power plant and concerned in detail in the Project. Turbine is selected by calculating loads and values which is related to turbine are calculated. By selecting a different turbine, differences between two turbines are studied. Besides, other characteristics related to hydroelectrics power plants are defined. At the end a conclusion is defined by preparing a detailed cost analsys with those characteristics.
Author
Dr. Seyfedin Gümüşel
Institution
How to Cite
Seyfedin Gümüşel (Master Thesis). The study for settings hydraulic power plant, 2007, Sakarya University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Sakarya University
- Computational investigation of battery materials using density functional theory(2023)
- Haci Ahmed b. Seyyid al-Bigavî and Tarjama al-Awārif al-maārif (sections of 22-43)(2024)
- Synthesis of carbazol substituted 3,4-dihydropyrimidine-2(1h)-thione deri̇vati̇ves(2024)
- Classification of recyclable wastes with deep learning models: A comparison on the effect of dataset size(2024)
- Hermeneutical analysis of sacrifice, sacred violence and scapegoat motifs in Turkish Mythology(2024)
- Novel thio-chalcone substituted metallophthalocyanines: synthesis, characterization and redox behaviour(2018)
