Yüksek LisansAçık Erişim

Kaynak dengeleme için en iyi proje süresi

Bu tez size mi ait?

Bu kayıt toplu arşivden geldi. Sizinse profilinize bağlayın.

2017
0 görüntülenme
0 i̇ndirme

Özet (EN)

Resource leveling is important in project management as resource uctuations are costly and undesired. Typically, schedules with better resource profiles are obtained using the schedule found by Critical Path Method and then shifting the activities within their oat times. However, if the project duration can be extended, it is plausible to find a schedule with enhanced resource leveling since a longer duration allows for more oat time for all activities. In this thesis, we investigate what the duration for the best leveled schedule should be. We provide mixed-integer linear models for several objectives including the Release and Rehire metric. We show that not all metrics used for leveling under fixed durations may be appropriate when the project duration becomes a decision variable. Optimal solutions from smaller problems are used to find the magnitude of the extension needed and benefits obtained thereby. Since the problem is a NP-hard problem for which exact solutions cannot be obtained for big networks, we modify Burgess-Killebrew heuristic to solve larger problems. Computational experiments with benchmark problems from the literature indicate that the more the number of resource types is increased, the less leveling benefits are gained from extending the project. The optimal project durations can also be significantly different for different metrics.

Yazar

Elif Eren

Bu Yayına Nasıl Atıf Yapılır

Elif Eren (Master Thesis). Kaynak dengeleme için en iyi proje süresi, 2017, Feyziye Schools Foundation Işık University.

Anahtar Kelimeler

Lisans

Tüm Hakları Saklıdır

Bu eser belirtilen lisans koşulları altında paylaşılmaktadır.

Feyziye Schools Foundation Işık University tezlerinden daha fazlası