Over the past twenty years, Turkey has increased its renewable energy investments partly to follow the global driving forces of decarbonization enforced by the international climate change regime, partly to attract finance from international financial institutions, and partly to substitute imported fossil fuel (mainly natural gas) with "domestic and national" energy. The rapid increase in renewable investments, coupled with the increasing authoritarian neoliberalism of the government has taken a heavy toll on the local communities by destroying their livelihoods and violating their political rights, leading to an increasing number of local resistance movements against hydro, wind, and geothermal power plants (GPPs). Against this background, this thesis aims to examine the multidimensionality of the injustices arising from the increased number of GPPs, particularly in Büyük Menderes and Gediz Grabens. A textual analysis of numerous reports, news articles, press releases, and videos was conducted to identify the stakeholders and their proposed alternatives, and to understand environmental justice issues surrounding the conflicts around these GPPs. This analysis was then substantiated by in-depth interviews and participatory observation in the fieldwork in Aydın, Mezeköy. The results of this investigation reveal that GPPs in the region induce massive ecological degradation, deepening the economic inequality by damaging agricultural production and by expropriating livelihoods and living spaces of the local communities, while simultaneously upholding the interests of the business. This inequality is further exacerbated by the increasing authoritarianism of the government, resulting in the deprivation of the cultural, political, and moral rights of the local people.
Author
Deniz Öztürk
How to Cite
Deniz Öztürk (Master Thesis). Political ecology of geothermal power plants in Turkey: The case of Büyük Menderes and Gediz grabens, 2023, Boğaziçi University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Boğaziçi University
- Investigating the factors affecting the acceptance of generative artificial intelligence in business intelligence applications(2025)
- Nükleer güç, emek ve çevre: Akkuyu NGS(2023)
- Behind the gallows: Capital punishment, law, and legislative performance in Turkey (1926-1990)(2025)
- Exploring the values for nature, nature connectedness, pro-environmental behaviour, and well-being: A case study on urban park visitors in Istanbul(2025)
- An assessment on the role of regional development agencies in environmental governance in Türkiye: A case study on Thrace Region(2025)
- Political ecology of milk production in Türkiye: Changing practices, rural livelihoods, and dairy animals(2025)