Building information model based construction planning software development
2021
0 views
0 downloads
Advisor: Doç. Dr. Önder Halis Bettemir
Abstract (EN)
In this study, the quantity calculation of each existing work item in the building construction, the man-hour calculations of the teams to be formed in response to the quantity made, the materials to be used in the construction phase, the creation of the teams for each work item, the work time and accordingly, the processes to be used in the preparation of the work program depending on the number of days and teams. It has been formulated by introducing the geometry of the product to be made and associating it with the existing material and equipment resource of the production to be made. Adhering to the item numbers specified in the unit price table published by the Ministry of Environment and Urbanization every year, the use of materials, labor and machinery equipment specified in the table was calculated by the unit calculation method of each work item and the amount of materials, labor and machinery equipment required in the construction of the building. On the other hand, labor productivity was calculated by taking into account the seasonal effect, which is not taken into account in the work programs, the holidays of the teams to work in the production, the current weather conditions on the day of production and the month of Ramadan, and a work schedule closer to reality was created with the effect of these yields on the work efficiency. In the light of these factors, the ability to calculate the most suitable conditions between the completion time of the construction and the start time has been developed and the completion time of the construction has been calculated relatively close to the truth. In the studies available in the literature, it is seen that the seasonal effect-related labor efficiency and the holidays of the teams to work in the project are not taken into account. As a result, it has been tried to model the work schedule and follow-up table for construction projects as close to reality by focusing on the problems that were avoided while creating the work program. Keywords: Building Information Model, Optimization, Critical Path Method, Cost performance index, Work program performance index
Author
Dr. Ömer Faruk Bulak
Institution
How to Cite
Ömer Faruk Bulak (Master Thesis). Building information model based construction planning software development, 2021, İnönü University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from İnönü University
- Knowledge, opinions and applications of pediatric nurses towards therapeutic games(2017)
- The effects of systemic pistacia eurycarpa yalt administration on alveolar bone loss and oxidative stress in rats with experimental periodontitis(2021)
- The effect of motivational interviews for primiparous pregnant women with low normal birth belief on medical and natural birth belief(2022)
- Retrospective investigation of genetic etiology in pediatric epilepsy patients based on targeted next generation sequence analysis datas(2022)
- The commentary methodology in the commentary on al-Fath al-Mubyn bi-Sharh al-Arba'eyn by Ibn Hajar al-Haytamy(2022)
- Comparison of serum BDNF, S100B levels of patients with bipolar disorder in manic and remission periods with healthy volunteers and evaluation of results with neuropsychological tests(2022)