Developing of a new in-situ monitoring system to determine the time-dependent mechanical behaviours of underground mine pillars: Electrical measurement method
Is this your thesis?
This record came from a bulk archive import. If it’s yours, link it to your profile.
Abstract (EN)
In the excavation environments of underground mining works, the balance of the original primary land stresses is disturbed and deformations occur. The original primary land stresses, which were disturbed by the fortification works, reach the secondary stress magnitudes by coming back into balance. Although stability is ensured by the fortification works in the excavation openings, the production works carried out in the nearby areas may affect this new balance again. The monitoring of the stress and deformation changes around the underground openings is made with measuring devices placed in the holes drilled in the side wall around the opening (gallery, tunnel, etc.). These gauges generally use hydraulic and/or electronic systems. Electrical Resistance Measurement System (ERMS) as an alternative to existing measurement systems was developed in this study and its first applications were carried out in TKİ-GLİ-Ömerler Underground Mine A6 production panel material gallery and A7 preparation panel transportation gallery. With this method, electrical resistance (Ω) changes in rock material around the opening exposed to dynamic loadings formed based on longwall production were measured from the measurements taken from five measurement stations established in A6 panel and fracture behaviors in heel rock material were examined. In addition, electrical resistance (Ω) behaviors explaining failures in coal material based on pressure created by hydraulic jack established in three application pockets prepared in A7 panel were determined. The measurement system (ERMS) presented in this study can be a new measurement method that can be used in determining failures and stabilities in rock materials in mining operations.
Author
Mahmut Yasin Çetinkaya
How to Cite
Mahmut Yasin Çetinkaya (Master Thesis). Developing of a new in-situ monitoring system to determine the time-dependent mechanical behaviours of underground mine pillars: Electrical measurement method, 2024, Konya Technical University.
Keywords
License
Tüm Hakları Saklıdır
This work is shared under the specified license terms.
More theses from Konya Technical University
- A study on the preparation of block planning principles in land consolidation projects(2023)
- Deep learning based visual and inertial data fusion for uav localization in case of GNSS signal losses(2025)
- Comparison of some manufacturing costs according to various analysis parameters and other regulations of reinforced concrete structures with different floor systems(2018)
- Evaluation of the rail transportation network relations with urban transformation projects by the traffic impact analysis method: A case study of the old industry in Konya(2019)
- Ahmet Hilmi Nalçacı as a leading person in the development of municipality in Konya(2019)
- The use of olive seed powders in vehicle brake pads and investigation of wear properties(2019)